As with pavers, base preparation is the most vital part of the installation
process. Begin laying out the trench with a string line. Dig a trench 6” to 12”
deep and about 4” wider than the width of the style of blocks you intend to use.
If your property slopes, step the trench up or down allowing for at least half
the height of a block to buried. This saves time and material. Compact the
trench and fill it with 3” to 6” of gravel(see "
Base Thickness
Chart"). Rake out, level, and compact the gravel.